EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
S-21
-
Listing for Category : fuel system
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (272)
Research
- (1)
Workshop
- (1)
Empennage
- (36)
Fuselage
- (48)
Firewall
- (14)
Tail Feathers
- (1)
Wings
- (93)
Controls
- (10)
Avionics
- (10)
Lighting
Instrument Panel
- (4)
-
Panel prep
-
Panel frame mods /...
-
Drilled subpanel for...
-
Fire Extinguisher...
Landing Gear
- (5)
Engine
- (30)
Propeller
Fuel System
- (1)
Interior Finish
- (12)
Paint / Decals
- (4)
Inspection
Tools
- (2)
Builder Name:
Kent Ingram
-
Project:
Rans - S-21 Outbound
-
VIEW REPORTS
Total Hours:
538.2
Total Flight Time:
Start/Last Date:
May 09, 2020 - No Finish Date
Friendly URL:
https://eaabuilderslog.org?s=S-21
Home or Last Project Picture
Apr 08, 2023
Header tank trim and fuel pump power wires
- (1.0 hour)
Category: Fuel System
Finished the header tank install by putting the rubber edging on the four exposed edges of the header tank retaining brackets. Also did a little wire sorting and decided to hook up the fuel pump power wire while it was on my mind. I also added a ground wire to the fuel pump and will take it to the rear where I will have a ground bus close to the battery. Tomorrow is Easter Sunday.
3C805C56-5501-46D6-9192-4CEBB087B79B.jpeg
00656570-02C3-439A-A77A-D89CFE9DCA69.jpeg
727A3E72-A5C4-4A4C-B01D-985B725B3CAD.jpeg
BB1E3833-DCF4-4A84-A6EF-0C5829088A91.jpeg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.